The Scope of the Works

Additional scope was added to the core building competition project and this was the primary and secondary water supply lines, fire line and sewer lines.Arrowsmith was occupied with the early tailings and auxiliary extraction framework development programs. Using our huge scope mining support armada and underground funneling groups. The venture comprised of site spearheading, stripping and accumulating dirt, unpleasant reviewing (cut, fill, molding and compacting), development and last evaluating of plant streets, seepage ditches, establishment of more than 10 km of huge width HDPE and carbon steel profound underground channeling, establishment of courses, and the development of a tempest water lake.This was classified as “deep underground” as the trenches were at minimum 6m in depth.

Works Program For Deep Underground project

This work was performed at the same time that the scope of the services installation was being undertaken underneath the prefabricated dormitories that were supplied to sit on a previously driven pile foundation.

Capital cost:

Scope duration:

Leadership team size:

Contract type:

Owner:


Contractor Client:

Project Site Office:
$11.0M

9 months (2012)

20 crew size

CCDC 4

Suncor


Clark Builders

Fort Hills Mine Site, Fort Hills, AB