Worked on a dedicated, multi-disciplinary projects team of approximately 15 staff where the preliminary and detailed design and construction of various process facilities were completed. Concrete and steel drawings and specifications were produced for both "green field" and "plant expansions" as relating to the processes of the gathering and recycling of used heavy oil products for various field locations throughout Western Canada. NewALTA Corporation Inc.
Working with acoustical consultants and structural fabricators produced structural steel design and fabrication drawings for the erection of acoustic enclosures for Alstom Power Inc.
Working with acoustical consultants, structural engineers and other technical staff to develope project layout drawings associated with the design and erection of an acoustic enclosure around the main turbine hall for one of the world’s largest EPCM companies.
Worked on a 45 plus person dedicated multi-disciplinary EPCM project team for the production of the structural drawings for piling arrangements, equipment and building foundations for a 250 Mega Watt addition to the existing 95 MW facility bringing the total available power to 360 MW. Manitoba Hydro - Brandon Generating Station.
Worked on behalf of the city to address weekly site inspections, contractor liaison and contract administration on the design and construction of various projects.