Coordinating the demolition of existing, laid out new pilings, drafted, inspected fabrication of and coordinated installation of concrete pile caps and new precast concrete panels which became the support for the new harbour front walkway and the gardens on the waterside of the Pacifica Condo.
Was a consultant for the City for the design, fabrication and installation of the new aluminum swing bridge on the Cities harbour walkway. This project addressed the status of existing site conditions, and the requirements of the City to make this a functional, yet safe project.